The intervention is necessary to restore the stability of no. 81 blocks in reinforced concrete prefabricated inside their seat (reinforced concrete floor), in fact when the track is unloaded the block is in the highest position with respect to the seat (reinforced concrete floor), while when the train passes the blocks are lowered inside the seat by more than 10 mm.