The structure originally dates back to the late 19th century and was built in solid brick masonry. The foundation is in brick with a laying surface placed at an indicative depth of about 1.5 - 1.8 m from the ground level.
The intervention has a provisional character as it is preparatory to the construction of a definitive foundation slab based on micropiles.